Hi hello from Haiti

Joined
Jan 19, 2018
Messages
5
New to forums.I will try to be as active as possible. internet here is still metered so i pay for every second I'm on the inter-web. and i do volunteer work as well. cheers! world.

have three objectives:
1. Convince my best friend that Lithium-ion 18650s used and new can besafe and effective when modulated.
i hope to gift him 50% of my powerwall as a homeOpening* gift!. A Gift a Energy.!?!?!!
2. To have a method to be energy sufficientoff solar and battery bank and really use adiesel Delco Gen-set as a stand-by backup reserve system! currently we spend $8,500 of diesel a year, just to power the house.
3. To inspire a generation of Haitians that renewable energy is not a myth, and can beaffordable.

so please, ideas help, continued inspiration. Please shed light on my ignorance and help me inspire more.

strart build to 10 kwh and the ultimate goal of 50 kwh power wall.
starting10 kwh systerm 14 in series. 14s80 or 14s100.

ill send pictures of my notes. on a better computer.

Ciao...soon!
Fritzgerald
 
Welcome.

The series depends on equipment you go with. Often is 14s the preffered. The parallel number depends on what you got in terms of cells. I like n+1 approach where you build so you can do maintenance without shutting it down.

So in general minimum of 2 or even better 3 strings.
So you need minimum 2 to run and the +1 is extra. So basicalli if you got cells to 14s100p x3 then thats the go. Also note that this depends on BMS. A better BMS like Batrium is not recommended to go above 300-400Ah per pack/longmon. That could be 100-200p packs.
 
daromer said:
Welcome.

The series depends on equipment you go with. Often is 14s the preffered. The parallel number depends on what you got in terms of cells. I like n+1 approach where you build so you can do maintenance without shutting it down.

So in general minimum of 2 or even better 3 strings.
So you need minimum 2 to run and the +1 is extra. So basicalli if you got cells to 14s100p x3 then thats the go. Also note that this depends on BMS. A better BMS like Batrium is not recommended to go above 300-400Ah per pack/longmon. That could be 100-200p packs.

Thank you. daromer. Thank you so much. yes, i will go with a 14s. and 3 Strings.
:arrow: 14s100p x3

We are receivingare going to have toordernew cells 18650 cells as there noneused or recycledhere.
:idea: What is the best mAh value on newer cells? [in your opinion daromer].
"not recommended to go above 300-400Ah per..."
:huh: [Help] "I like n+1 approach where you build so you can do maintenance without shutting it down."that sounds most awesome-st! help. please elaborate!
So in general minimum of 2 or even better 3 strings.
:huh: So you need minimum 2 to run and the +1 is extra. please elaborate some more.
Very interested in the Batrium BMSreally mindblown:angel: .Think will be worth the investment!
Also adding 'Glass fuses'asseen in AveRage Joes Video's). Awesome-st!

Electrical and medical parts get quickly recycled by a NGOin Haiti and shipped out of country.

again much obliged!
 
Back
Top