New power wall Mures

Umm sounds strange. You are measuring the AC side after your PV inverters and not the DC side of you PV.
 
I emailed Sofar and they sent me a download link for the firmware
 
Umm sounds strange. You are measuring the AC side after your PV inverters and not the DC side of you PV.
I found the problem :) clamp should be only on the line wire, initially null and ground was in the clamp… my mistake I didn’t read very carefully diagram from Sofar
 
Umm sounds strange. You are measuring the AC side after your PV inverters and not the DC side of you PV.
Yes, I have 2 inverters both on grid and are 30m away in the back yard, that is why I measure AC production on the main cable from PV.
 
I emailed Sofar and they sent me a download link for the firmware
I’ve got the email with the firmware from the local seller, sofar didn’t respond directly to my email. Anyway system is working fine, I’ve added a new row of cells, now a total of 840 cells in 14s60, self usage has now increased from 25% to 60% with just a few days of sun. I’ll have to add more cells to increase storage capacity and also to grow charge/discharge, now I’ve set it to max 25A.
 