Wattsup
Member
- Joined
- Feb 19, 2017
- Messages
- 513
Hi guys,
I need some help setting up the shunt trip on my system.
This is the shunt trip/ breaker I have
This is how my system is currently wired
There are 2 positive wires coming from the battery bank (inverter & charge controller).
The negative from the battery bank goes to the shunt, which also has negative wires from inverter and charge controller.
So should I run the 2 x positive and negative wires into some sort of combiner, then the single positive and negative into the breaker attached to shunt trip?
I know from Daniels vid the shunt trip needs to be after the watchmon.
I need some help setting up the shunt trip on my system.
This is the shunt trip/ breaker I have
This is how my system is currently wired
There are 2 positive wires coming from the battery bank (inverter & charge controller).
The negative from the battery bank goes to the shunt, which also has negative wires from inverter and charge controller.
So should I run the 2 x positive and negative wires into some sort of combiner, then the single positive and negative into the breaker attached to shunt trip?
I know from Daniels vid the shunt trip needs to be after the watchmon.