Hello ,
I'm still in the process of builduing my Powewall ( collecting and testing cells ),
but have a temporary Battery allready connected to my two Pips to be able to use solar power a bit.
Atm only everything in my Backjard is running on this offgrid system.
The batteries don't have a BMS jet, they are build of three extended 36V e-bike Batteries ( plus 4 x 6Cells ) to get up to 48Volt.
I check them daily regarding their voltage.
When to much load for this small Battery bank is used ( for example lawn mower and poolpump) , it can occure, that one cell block in the packs gets under 3 Volt.
I would like to avoid such situations, therefore my question:
How do I have to set the parameters in Watchpower that way, that only SolarPower and aminimum to nothing of the Batterypower is used and if Solar is not sufficient, it shortly switches to grid?
Regards
cadric
I'm still in the process of builduing my Powewall ( collecting and testing cells ),
but have a temporary Battery allready connected to my two Pips to be able to use solar power a bit.
Atm only everything in my Backjard is running on this offgrid system.
The batteries don't have a BMS jet, they are build of three extended 36V e-bike Batteries ( plus 4 x 6Cells ) to get up to 48Volt.
I check them daily regarding their voltage.
When to much load for this small Battery bank is used ( for example lawn mower and poolpump) , it can occure, that one cell block in the packs gets under 3 Volt.
I would like to avoid such situations, therefore my question:
How do I have to set the parameters in Watchpower that way, that only SolarPower and aminimum to nothing of the Batterypower is used and if Solar is not sufficient, it shortly switches to grid?
Regards
cadric