just an INTRO on what my plans are and a little about the requirements of my project for context for future questions.
located Brisbane 20mins from the city.
I run an usual set up for my industrial site urban farm.
There is no metereddirect power supply to my lease, despite being advertised with power to the office,except a 3 phase and single phase connection from next door on my property.
I wasusing theslaved off connection fromthe neighbors at a charge rate of a 70/30 split of the billwhere I have topay the 70%whichtotals at$340 a quarter for the daily use of 4 1/2 kw to runmy aquaponics system. which is nearly X3 the cost of the consumption.
In order to reduce further operational costs I installed a reclaimed Solar/Ups system consisting of 4 X 250w panels and 24V 200ahon my Acto/mushroom inoculation lab driving the fans and lighting and emergency air backup system for my fish during outages or tripped breakers as I don't have access to the meter box inside the neighbors shed.
Because of this any use of my high load power tools are run offthe generator.
After 14 months of this I finally had the shits, disconnected the supply told the neighbors i am no longer paying theconnection and half their usageto their businessand increased my battery bank to 24V 440 ah and now run the genset of a day to top up the banks when required. which costs me $20 per month in fuel.
I am now in a situation were I need to go commercial and the genest is no longer a viable option, food safety reasons and I need to power a setof air-consfor my coolroom and mushie grow tents.
I am looking at 2 separate builds the first will be a DC set up to power my 24/7 low load fans,humidifiersand led flood lighting which tallys up to 20amps per hour at 12V
this build I want completed within the next 2 months ready for next winters mushie productionand should be a good project to learn from before tackling the 5 kwAc system next year, ideally I would like it near completed byjulyas I will be working on the second story of the hoophouse roof in winter installing panels.
I am very fortunate to have close friends on the property behind me that own a junk removal/ recycling business and at this point of time about 80% of the building materials used on the farm project have been sourced from them, about six months back i scored 20sets of tough books from them each with 2 sets of battery packs and a few NIB, laptops, medical equipment, scrap copper and building supplies arrive daily to my yardif i bribe the truckdrivers with Dan Murphys Gift vouchers"as the junk gods only respond to prayers offered in exchangewith alcohol"
I appreciate any advice on these builds and I will post full details of what the usage requirements are, and thematerials that I havealready sourced.
If there is any thing I should really keep an eye out for at the recycling centre throw me a pic as the boys there have no idea on what the have in the trucks.
Day (1) 18 months ago
located Brisbane 20mins from the city.
I run an usual set up for my industrial site urban farm.
There is no metereddirect power supply to my lease, despite being advertised with power to the office,except a 3 phase and single phase connection from next door on my property.
I wasusing theslaved off connection fromthe neighbors at a charge rate of a 70/30 split of the billwhere I have topay the 70%whichtotals at$340 a quarter for the daily use of 4 1/2 kw to runmy aquaponics system. which is nearly X3 the cost of the consumption.
In order to reduce further operational costs I installed a reclaimed Solar/Ups system consisting of 4 X 250w panels and 24V 200ahon my Acto/mushroom inoculation lab driving the fans and lighting and emergency air backup system for my fish during outages or tripped breakers as I don't have access to the meter box inside the neighbors shed.
Because of this any use of my high load power tools are run offthe generator.
After 14 months of this I finally had the shits, disconnected the supply told the neighbors i am no longer paying theconnection and half their usageto their businessand increased my battery bank to 24V 440 ah and now run the genset of a day to top up the banks when required. which costs me $20 per month in fuel.
I am now in a situation were I need to go commercial and the genest is no longer a viable option, food safety reasons and I need to power a setof air-consfor my coolroom and mushie grow tents.
I am looking at 2 separate builds the first will be a DC set up to power my 24/7 low load fans,humidifiersand led flood lighting which tallys up to 20amps per hour at 12V
this build I want completed within the next 2 months ready for next winters mushie productionand should be a good project to learn from before tackling the 5 kwAc system next year, ideally I would like it near completed byjulyas I will be working on the second story of the hoophouse roof in winter installing panels.
I am very fortunate to have close friends on the property behind me that own a junk removal/ recycling business and at this point of time about 80% of the building materials used on the farm project have been sourced from them, about six months back i scored 20sets of tough books from them each with 2 sets of battery packs and a few NIB, laptops, medical equipment, scrap copper and building supplies arrive daily to my yardif i bribe the truckdrivers with Dan Murphys Gift vouchers"as the junk gods only respond to prayers offered in exchangewith alcohol"
I appreciate any advice on these builds and I will post full details of what the usage requirements are, and thematerials that I havealready sourced.
If there is any thing I should really keep an eye out for at the recycling centre throw me a pic as the boys there have no idea on what the have in the trucks.
Day (1) 18 months ago