View attachment 9
Hi all
I open this tread for my Storage battery Off-grid system .
I already bought by ebay, the second hand 2 x 24v/250Ah Tesla batt.Max voltage 50.4 v Min 42v (if will be Ok I will go toorder 4 more pc)
I had already in my system 48v/400Ah Bank Gel Batt UCG 12 200 ->8 ea Float 54.6V bulk 57.6v.
my I ask : I can run in paralel the above battery bank?
Also I need an idea for how I will goto use the BMS from them?
My system :
2 x PIP-4048MS /paralel mode; PV- 12x 240w poli + 9 x 260w poli (each PV group on the single invertor); 2 x 4 UCG 12v 200AH,
My Idea .
Is will use the PIP Aux contact to open one DC power contactor when the Tesla battery reach to 50V.
For avoid the triggering repeat of theDCcontactor , I will use one control Timer Relay 5-20sec
po
we
r
Hi all
I open this tread for my Storage battery Off-grid system .
I already bought by ebay, the second hand 2 x 24v/250Ah Tesla batt.Max voltage 50.4 v Min 42v (if will be Ok I will go toorder 4 more pc)
I had already in my system 48v/400Ah Bank Gel Batt UCG 12 200 ->8 ea Float 54.6V bulk 57.6v.
my I ask : I can run in paralel the above battery bank?
Also I need an idea for how I will goto use the BMS from them?
My system :
2 x PIP-4048MS /paralel mode; PV- 12x 240w poli + 9 x 260w poli (each PV group on the single invertor); 2 x 4 UCG 12v 200AH,
My Idea .
Is will use the PIP Aux contact to open one DC power contactor when the Tesla battery reach to 50V.
For avoid the triggering repeat of theDCcontactor , I will use one control Timer Relay 5-20sec
po
we
r