Well I've been sitting back and taking in all the info available here and its time to introduce myself and share my progress.
My name is Garry. I am building a 48V system to eventually suppement the load on my house. I have 10k Solar Install to start in a week or so (awaiting final permits). Solar Edge with 37 280watt panels an no Storage. The cost was too much for my pocket. So I decided to add my own and that is how I found you guys.
Because my solar install is being professionally done there are some limitations on what type of Storage I can add to the system. I was told Solar edge will only permit Tesla or LG brand batteries to be hooked to it. So I am having them install 3 extra panels totally isolated from the main system. I will use this setup to perfect my Powerwall and satify my curiosity to Do It Myself. My hopes is that the restrictions will be lifted an I ca n add my batteries to the main system. Untill then I will be powering my Garage.
Although most of the Packs see here are all straight parallel I decided to do my packs as 14s11p or 14s 16p. This is proving to be very complicated and expensive but I am determined to overcome these challenges.
My Powerwall will be mounted inside Server Cabinets in my Garage
PCM60X Charge Controller
AIMS 2000W Inverter
My name is Garry. I am building a 48V system to eventually suppement the load on my house. I have 10k Solar Install to start in a week or so (awaiting final permits). Solar Edge with 37 280watt panels an no Storage. The cost was too much for my pocket. So I decided to add my own and that is how I found you guys.
Because my solar install is being professionally done there are some limitations on what type of Storage I can add to the system. I was told Solar edge will only permit Tesla or LG brand batteries to be hooked to it. So I am having them install 3 extra panels totally isolated from the main system. I will use this setup to perfect my Powerwall and satify my curiosity to Do It Myself. My hopes is that the restrictions will be lifted an I ca n add my batteries to the main system. Untill then I will be powering my Garage.
Although most of the Packs see here are all straight parallel I decided to do my packs as 14s11p or 14s 16p. This is proving to be very complicated and expensive but I am determined to overcome these challenges.
My Powerwall will be mounted inside Server Cabinets in my Garage
PCM60X Charge Controller
AIMS 2000W Inverter