rdh824
New member
- Joined
- Nov 21, 2017
- Messages
- 19
This is my first powerwall, about 2.6kWh,that I've been working on for a few months. It consists of minipacks(BabyPackMons) of 7 cells each, so7s49p.The Mini packs haveinternal7 waycontacts and clinch pins on both sides of the cells whichall slightly compress the cells with a screw on cap. Thepins snap into 3AG fuse clips which are connected to copper busbars. Just connected a 7s 24V 60ASmart BMS. The 3 columns on the right I used sonata 5300.
The lastpic shows with the cap off.
Starting making the red snaps caps to cover the busbars.
The lastpic shows with the cap off.
Starting making the red snaps caps to cover the busbars.