Hey everyone, new to the forum here and I'm looking forward to talking to everyone here. I figured I'd start a thread on my project I've just begun the long process of harvesting and testing cells and have put together an initialdesign for my packs. They will packs of 100 cells all a minimum of 2000mAh. I plan to start with a 48v setup and eventually possibly a 240v setup since I have an old industrial UPS system that is setup for a 240v battery and is rated for 10kW continuous. Here's a few screen captures of the current pack design, hopefully I can do a test cut of the Acrylic tomorrow and do any necessary tweaking.
I currently have mounting previsions for Longmons as well as holes for zip ties to help hold down the bus bars particularly at the ends of the pack.
I currently have mounting previsions for Longmons as well as holes for zip ties to help hold down the bus bars particularly at the ends of the pack.