Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Hello from Basque Country
#1
I am testing a lithium battery 18650 20px7s 24v and approximately 1KW with Chinese BMS android, at the moment 6 months in tests and ok. TV consumption, lighting and fridge for beers. 160W solar panel and weekend use.

In this forum I found the information I needed to start the project, thank you
chuckp likes this post
Reply
#2
(05-02-2019, 06:43 PM)txurdi Wrote: I am testing a lithium battery 18650 20px7s 24v and approximately 1KW with Chinese BMS android, at the moment 6 months in tests and ok. TV consumption, lighting and fridge for beers. 160W solar panel and weekend use.

In this forum I found the information I needed to start the project, thank you

We love photos here, nice to see what everyone is doing.
UK Southwest.

7 kWp Solar Panels (28 x 250Wp Shinetime Mono).
14 X APS YC500i Micro Inverters.
28 X 40P 18650 cell packs/modules configured as 14S 80P.
Sofar Mass Energy ME3000SP AC coupled charger/inverter.
Still sourcing and processing cells for powerwall.
Reply


Who read this thread?
17 User(s) read this thread:
hbpowerwall (05-06-2019, 10:29 PM), juanjo57 (05-03-2019, 03:49 PM), bertvaneyken (05-03-2019, 08:38 PM), Richard (05-02-2019, 08:23 PM), Wolf (05-03-2019, 01:31 PM), chuckp (05-02-2019, 11:16 PM), Riplash (05-03-2019, 05:47 AM), Oliman (05-03-2019, 07:27 PM), txurdi (05-03-2019, 05:09 AM), ChrisD5710 (05-03-2019, 11:07 AM), Geek (05-03-2019, 04:01 AM), watts-on (05-03-2019, 08:57 AM), Franky Beuselinck (05-15-2019, 02:20 PM), PAF (05-03-2019, 10:45 AM), Korishan (05-02-2019, 11:34 PM), Sean (05-02-2019, 11:39 PM), ben teker (05-03-2019, 08:31 PM)

Forum Jump:


Users browsing this thread: 1 Guest(s)