Operating GTIL2 at 240v to supply split phase mains
#1
No way I was retyping all this
100kwh-hunter likes this post
Reply
#2
(09-09-2019, 09:42 PM)Doin it Wrote: No way I was retyping all this

Copy paste Wink
100kwh-hunter likes this post
Proceed with caution. Knowledge is Power! Literally! Cool 
Knowledge is Power; Absolute Knowledge is Absolutely Shocking!
Certified 18650 Cell Reclamation Technician

Please come join in general chit-chat and randomness at Discord Chat (channels: general, 3d-printing, linux&coding, 18650, humor, ...)
(this chat is not directly affiliated with SecondLifeStorage; VALID email req'd)
Reply
#3
I’m not up with all the ways to do that kinda stuff..I’m a Construction contractor so never used computers much
100kwh-hunter likes this post
Reply
#4
Test concluded btw...over 100kwh used since test started and iotawatt readings and electric company reading of my total usage are exactly the same (within 1kwh) So split phase main panel with inverter supplying at 240v, the limiting single phase inverters (gtil2) does not backfeed to the grid..

wolf and solardad..what do yas think?
Reply


Who read this thread?
14 User(s) read this thread:
Sean (09-10-2019, 08:41 PM), Doin it (09-13-2019, 12:38 AM), 100kwh-hunter (Yesterday, 02:48 PM), ajw22 (09-11-2019, 01:11 PM), Solardad (09-09-2019, 10:37 PM), Wolf (09-10-2019, 08:44 PM), chuckp (09-10-2019, 11:23 PM), Riplash (09-11-2019, 03:02 AM), Geek (09-11-2019, 11:52 PM), watts-on (09-11-2019, 03:01 PM), jdeadman (09-10-2019, 07:52 PM), A + A (09-11-2019, 09:41 AM), Korishan (09-10-2019, 07:39 PM), LPG (09-10-2019, 10:54 PM)

Forum Jump:


Users browsing this thread: 1 Guest(s)