Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Batrium and Conext integration
#3
Batrium did respond to my email. Yes, Schneider is still "on the to do list" so to say.

But, the bridge functionality was integrated into the Conext Gateway. When Batrium gets around to it, they will likely use the gateway as the point of integration with they system.


How do you like the 6848+? It is great on paper, but if feel like most people around the internet think Victron or one of the other names is a better choice. But, I believe the Schneider fits my needs better than the others.


My permit is for a 6848 pro, gateway, and mini power distribution panel. Using the mini power distribution panel, I can run the solar directly there, instead of AC coupling at the critical loads panel.

We'll see how well that plan sticks as I work through the slow build.
Reply


Messages In This Thread
Batrium and Conext integration - by 400bird - 06-18-2020, 02:39 AM
RE: Batrium and Conext integration - by 400bird - 07-01-2020, 06:01 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)