Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Question regarding Magnum Energy ME-ARTR
#1
Hello, I am just starting to setup my off grid system, and I have been cutting my battery bank on and off every time I go to the property. I have noticed that I have to set the date and time every time on the Magnum Energy ME-ARTR (the advanced router).

Is this normal, or is there a way to save the settings I am missing? Also, if it is losing the date/time, is it also losing my battery settings?


EDIT: After reading the manual a bit more I found that the clock settings reset when it is powered down. So it is normal, and I should not have worried lol. Another example of "RTFM".
System: Magnum MS4448PAE, MPDH175-30D Panel, Magnum PT-100 Charge Controller, 14s15p 21.5kwh Lithium NMC battery bank, Batrium Watchmon 4, 16 Silfab SLA-M 310 solar panels.
Reply
#2
What encouraged you to buy a Magnum, and a BMS that cant natively communicate ?
Reply
#3
Me buying the inverter/charger setup before i decided on a BMS solution.

Then the BMS seemed easier to work with than other DIY setups.

If I was to do it again I would probably look for a more compatible pairing.
Sean likes this post
System: Magnum MS4448PAE, MPDH175-30D Panel, Magnum PT-100 Charge Controller, 14s15p 21.5kwh Lithium NMC battery bank, Batrium Watchmon 4, 16 Silfab SLA-M 310 solar panels.
Reply


Who read this thread?
10 User(s) read this thread:
Sean, Korishan, watts-on, Geek, ChrisD5710, shonalex, djuro, xephonics, cowpen, juanjo57

Forum Jump:


Users browsing this thread: 1 Guest(s)