I have some lower range cells that are to low for main packs but want to use them for testing my pack build skills while i am getting larger number for main build. Just making sure I am understanding correctly.
the pack that i have on hand is based on a 24v 7S.. The pack is small and will be a 6P with 7.6AH of storage. Each was testing at 1 amp to keep it standard.
When making the buss bar, i am based on light duty use. So I would not expect more than 1 amp pull on each cell.
when doing the total load for the cable, would I count each string... 6 on this one for max of 1 amp = 6 amps plus the 6 others for a max of 42 and then add a buffer of some to be safe..and base on 60 amps total?
I thought I had a clue and then clue showed me that I didnt.
CB
the pack that i have on hand is based on a 24v 7S.. The pack is small and will be a 6P with 7.6AH of storage. Each was testing at 1 amp to keep it standard.
When making the buss bar, i am based on light duty use. So I would not expect more than 1 amp pull on each cell.
when doing the total load for the cable, would I count each string... 6 on this one for max of 1 amp = 6 amps plus the 6 others for a max of 42 and then add a buffer of some to be safe..and base on 60 amps total?
I thought I had a clue and then clue showed me that I didnt.
CB